EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RANS21RB
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (678)
Research
Workshop
- (4)
Empennage
- (37)
Fuselage
- (155)
Firewall
- (19)
Tail Feathers
- (4)
Wings
- (99)
Controls
- (20)
Avionics
- (52)
Lighting
- (9)
Instrument Panel
- (8)
Landing Gear
- (6)
Engine
- (82)
-
Fogged cylinders and...
-
Silicone Baffling
-
Baffling and Paint Prep
-
Baffling
-
Baffling
-
Baffling ans wiring
-
Baffle seals
-
Baffle Seals
-
Baffle seals
-
Baffles
-
Engine Baffle Seals
-
Baffling
-
Wiring
-
Wiring
-
EGT Probes, Ignition...
-
Exhaust
-
Exhaust and securing...
-
Baffles
-
Air Box
-
Engine
-
Baffling and Oil Dip...
-
Cowling
-
Oil door and cowling...
-
Oil Access Door
-
Cowling
-
Cowling
-
Cowling
-
Cowling
-
Cowling
-
Cowling
-
Cowling
-
Cowling
-
Cowling
-
Throttle and Mixture...
-
Throttle Cable
-
Baffles and windshield
-
Engine wiring
-
Prop flange and...
-
Coanda Fairing and...
-
Ignition wiring
-
EGT Probes and Airbox
-
CHT Probes and...
-
Airbox
-
Airbox
-
Airbox and Baffling
-
Baffling
-
Baffling
-
Front baffling
-
Baffles
-
Baffles
-
Baffling
-
Baffling
-
Baffling
-
Baffling
-
Baffling
-
Baffling
-
Baffling
-
Fuel and pressure lines
-
Wiring
-
Wiring
-
Wiring
-
Engine accessories
-
Engine Accessories
-
Starter ring gear...
-
Engine accessories
-
Engine accessories
-
Engine Install
-
LSE Ignition
-
Engine Buildup
-
Engine Accessories
-
Engine Accessories
-
Engine prep
-
Engine Accessories
-
Firewall wiring
-
Wiring
-
Firewall Accessories
-
ANL Fuse
-
Pressure Manifold
-
Wiring
-
Cabin Heat Box and...
-
Engine controls and...
-
Engine Delivery Day
Propeller
Fuel System
- (6)
Interior Finish
- (28)
Paint / Decals
- (90)
Inspection
- (4)
Tools
Inventory
- (3)
Kit Delivery
- (1)
Reassembly
- (51)
Builder Name:
Randall Brooks
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1990
Total Flight Time:
Start/Last Date:
Apr 03, 2021 - No Finish Date
Engine:
Titan IO-340 180HP
Propeller:
Whirlwind
Friendly URL:
https://eaabuilderslog.org?s=RANS21RB
Home or Last Project Picture
Nov 03, 2022
LSE Ignition
- (5.5 hours)
Category: Engine
Wired Input and Output dsub connector wire bundles for both LSE ignition boxes. Remaining tasks for final ignition hookup are mounting coil packs on engine, hooking up RG400 cables to coil packs and mounting mini sensors for ring gear.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.